99 Hobson
Street

Benchtop leveling - 19 April

bench top leveling

An earlier attempt to address an issue with bench top levels did not solve the problem, so today a splash back panel and significant part of the top had to be removed so the joinery could be adjusted.

It's distressing to see such a major intervention for a kitchen that has just been finished - very disappointing that Palazzo didn't identify the significant problem with its installation at the time.

First tree - 25-28 April

tree

After preparing the ground with a gypsum and good-old-fashioned digging, the first plantings are in.

We've chosen a magnolia to add a structural element to the garden without over-powering the space. We hope the lemon likes its sunny spot.